RESOLUTION NO.      2002-04    

 

In the matter of initiating county road projects and assigning CRP numbers.

 

BE IT RESOLVED by the Skamania County Board of Commissioners (Board) that the road(s) listed below be improved as shown between the points indicated.

 

BE IT FURTHER RESOLVED that these projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to report and proceed thereon as by law provided.  (RCW 36.75.050, 36.80.030, 36.80.070) (Optional References).

 

BE IT FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county engineer’s estimates are hereby made in the amounts and for the purposes shown:

1

2

3

4

5

6

7

8

9

 

ROAD NAME AND/OR BRIDGE NUMBER

 

ROAD LOG NO.

 

 

TYPE OF WORK (See Code)

CONTRACT

DAY LABOR

 

COST ESTIMATE (THOUSANDS)

 

 

 

CONSTRUCTION

 

Annual Const. Prog. Item No.

 

 

 

 

CRP No.

M.P. TO M.P.

Engin. &      

R.O.W.

GRANT

LOCAL

 

Carson Creek Road Widening / Culvert

 

Little White Salmon River Bridge Maint. (Nutririon Lab Bridge)

 

Washougal River Rd.

 

 

20450

 

 

93041

 

 

91140

 

 

 

0.11

 

 

5.55

 

 

9.42

 

0.12

 

 

5.58

 

 

9.80

 

 

 

 

A

 

 

A,I

 

 

A,B

 

 

 

 

 

 

 

X

 

X

 

 

X

 

15

 

 

5

 

 

46

 

 

 

 

 

 

 

 

40

 

 

 

 

3

 

 

6

 

 

7

 

2002-01

 

 

2002-02

 

 

2002-03

 

(4) TYPE OF WORK CODE                                (5) The construction is to be accomplished by contract in

            A.  Preliminary Engineering                           accordance with RCW 36.77.020 et. seq.

B.      Right-of-way

C.      Grading, Draining, Surfacing              (6) The construction is to be accomplished by county forces

D.      Light Bit. Surf. Treatment                        in accordance with RCW 36.77.060 and WAC 136-18.

E.      A.C. or P.C.C. Pavement

F.      Curbs & Gutters

G.     Sidewalks

H.      Traffic Facilities

I.         Bridge Construction

J.       PATHS & TRAILS (RCW 47.30)                   

 

ADOPTED this 14th day of January, 2002.

 

 

Recommended for use in connection with WAC 136-18-030, for multiple project initiation.

 

NOTE:  This form is intended for use in connection with WAC 136-18-030 and makes provision for all pertinent information.  It is designed for a situation where the Board of County Commissioners desires to initiate several road projects at one time.  For those desiring individual initiation it is suggested that a Form similar to CRAB 110 be used.

 

For projects that will require a significant amount of preparatory engineering it is suggested that this form be used first to make only the appropriation for engineering.  After the engineering has been completed and an accurate estimate is available for construction and, if applicable, for right-of-way acquisition, it may then be used a second time (same CRP No.) to appropriate funds for right of way acquisition and construction.